Background
SSA had previously installed a septic system for the cellar door at Helen & Joey Estate. The next stage of the project was to design and install a wastewater treatment system for the hotel, restaurant and winery.
SSA designed and constructed a new 10,000 litre per day wastewater treatment plant, with a wet weather storage dam and Subsurface irrigation.
SSA also managed the EPA approval process before and post installation.