Background
The existing septic system for the Club was old and had done its job for the past few decades.
SSA was called in to design and install a system to accommodate the next generation of bowlers and workshopped a number of options to prevent the loss of valuable car parks and beautiful vegetation onsite.
This was a tricky 6-day installation that had to minimise disruption to footpaths, car parks, grease traps, established gardens and, of course, the Club house itself, while battling the ever-present rain and mud on the Mornington Peninsula.