Background
SSA worked with architects on behalf of the Department of Education to replace the existing the septic system and future-proof the school for growth for the next 10 years.
SSA completed the design work, including a Land Capability Assessment report, obtained council permits and then successfully competed in a competitive tender process to install the system onsite.
SSA installed a Dosing Tank; an aerated wastewater treatment system to cope with the Daily Hydraulic Load and BOD Loading; and subsurface irrigation.
SSA also workshopped some different options with the architects and arborists to protect the mature trees onsite.