Background
SSA was called in to inspect an old conventional septic system that was failing. The absorption trenches were blocked and raw effluent was pooling on the grass area in the backyard.
SSA designed, obtained permits and installed a new Secondary Treatment system, with Subsurface irrigation, as per Mornington Peninsula Septic Guidelines.
Additional works included removing excess soil from site and electrical connections back to the switchboard.