Showing 11 - 18 of 18 projects

Commercial Installation, Silvan Reservoir Park
SSA was engaged to do the design and installation of the commercial wastewater treatment system for the popular picnic destination at Silvan Reservoir Park.

Commercial Installation, Helen & Joey Estate
SSA designed and constructed a new 10,000 litre per day wastewater treatment plant, with a wet weather storage dam and Subsurface irrigation.

Commercial Installation, Traralgon South Primary School
SSA worked with architects on behalf of the Department of Education to replace the existing the septic system and future-proof the school for growth for the…

Residential Installation, Red Hill
SSA was called in to inspect an old conventional septic system that was failing. The absorption trenches were blocked and raw effluent was pooling on the…

Commercial Installation, Main Ridge Bowls and Petanque Club
The existing septic system for the Club was old and had done its job for the past few decades. SSA was called in to design and…

Commercial Installation, Melton Christian College
SSA was engaged to design and install a commercial wastewater treatment system for a new Secondary school in Melton for students and staff. SSA worked with…

Residential Installation, Emerald
SSA’s service and maintenance team was initially engaged to investigate the condition and advise on possible repair of a septic system in a residence in Emerald.

Residential Installation, Langwarrin
SSA’s client had only recently moved into their new house to discover that their existing septic was failing split the grey and black water into separate…